Thursday, September 10, 2009

CP Division


This is the newest addition to the SFP. The storage yard pictured does not connect with the rest of the railroad. The large grain facility was scratchbuilt using PVC pipe. The signal in the picture is the west limits of CP Division and is the last location visible on the mainline. If you enlarge the photograph, you will notice the "A" on the signal mast. This was common to prototype installations in 1979. It signified the absolute stop at that signal.

No comments:

Post a Comment